Method Handling for PGN SAKA West Pangkah (1)

This presentation is consisting method handling how we can send portable dredging equipment to west Pangkah area where we can not send the equipment by land transport or directly by sea because the area still swamped the vessel like LCT can not beaching to the project site.

It is a simple plan but not just a simple work. The floating shall be calculated, the tide and wind speed shall be predicted, the crane shall be ballasted, and the lashing shall be adequate for the safety reason.