Method Handling for PGN SAKA West Pangkah (2)

This presentation is a proposal how to build temporary jetty for landing base at west Pangkah, Gresik for discharging heavy equipments, cranes, and trailers. The area is not suitable for land hilling from the shore by dropping stone and aggregate materials using dump trucks. The backfilling material shall be transported using barges and hilling at the designed area using excavators, vibro, and dozer. In this method, scheme of the temporary jetty, filling material component, and ground settlement was provided.